ENGINE FACTORY .COM

Let's Build a 427 Ford Stroker Engine Together!

 

Video #1

Each part is computer generated and analyzed to make sure they are all compatible; Machine worked to obtain proper clearance.

 

Video #2

Explanation of High Lift Large Duration Roller Cam Shaft, Warning Regarding Cam Gear Compatibility, Timing Chain and Timing Cover Installation.

Video #3

Installation of Oil Pump, Roller Lifters, Lifter Harness, Harden Pushrods, and Guide Plate to Push Rod Warning.

 

Video #4

Block shown with Power Forged Pistons, Deck Surface, Front Sump Pan, and Timing Cover Installed. Roller Lifters and Cylinder Head Bolts.

Video #5

Proper Head Gasket Installation Left and Right, Head Installation on Alignment Pins and Lifter Harness Installed.

 

Video #6

Roller Rocker Arm Installation, along with Precision Valve Geometry and Valve Adjustment.

Video #7

Checking the Valve Spring's for Coil Bind, Installation of Air Gap Intake Along with Gaskets and End Seals.

 

Video#8

Carburetor Installation and Adjustments, Valve Cover and Baffle Warning, Thermostat and Housing Installation.

Video #9

Harmonic Balancer Bolt Patterns, Both 3-bolt and 4-bolt Systems, along with Timing Pointer Installation.

 

Video #10

Fuel Pump and Braided  Line Installation, Different Flywheels and Different Balance, along with Dip Stick and Distributor Installation.

 

Video #11

Installation of Coil and Wiring, Low Profile Air Cleaner, Serpentine System with 100AMP Alternator.

 

Best if viewed in numerical order

1-800-326-6554

Hit Counter

All Pages Copyright © 1997 - 2011 Engine Factory, All Rights Reserved